List of Orders

Hokuriku Regional Agricultural Administration Office

Project name: Harue hokubu

  • Completed in 2018
  • Sakai City, Fukui Prefecture
Low-drop unit-type hydroelectric power equipment: Hydro-eKIDS (1~47.7KW)

* Prime project contractor: Toshiba Energy Systems & Solutions Corporation

Sigma Power Sendai Hydropower Co., Ltd.

Project name: Kamioizawa Power Plant (Inside the Sendai City Waterworks Bureau Grit Chamber)

  • Completed in 2015
  • Sendai-City, Miyagi Prefecture

Ueoizawa Power Plant Ueoizawa Power Plant

Scope of order: Low-drop unit-type hydroelectric power equipment: Hydro-eKIDS (200KW)

Mibugawa Electric Power Co., Inc.

Project name: Mibugawa No.4 Power Plant

  • Completed in 2009
  • Ina City, Nagano Prefecture

Mibugawa No.4 Power Plant Mibugawa No.4 Power Plant

Scope of order: Low-drop unit-type hydroelectric power equipment: Hydro-eKIDS (6~100KW)

Bridgestone Corporation

Project name: Nasu Plant

  • Completed in 2008
  • Nasushiobara City, Tochigi Prefecture
Scope of order: Low-drop unit-type hydroelectric power equipment: Hydro-eKIDS (9KW)

Den-en Chofu Gakuen Junior & Senior High School

Project name: Den-en Chofu Gakuen Hydro Generator

  • Completed in 2005
  • Setagaya-ku, Tokyo
Scope of order: Low-drop unit-type hydroelectric power equipment: Hydro-eKIDS (4.4KW)

Low-drop unit-type hydroelectric power r equipment: 71 units of Hydro-eKIDS delivered at 44 locations in addition to the above

Read more

The hydroelectric power generation equipment (small and medium-sized) business was transferred to Toshiba Energy Systems Co., Ltd. on December 1, 2020.
https://www.toshiba-energy.com/