List of Orders
Mizkan Holdings Co., Ltd.
Project name: Mizkanfs New Plant Production Facilities Construction
- Completed in 2014
- Minokamo City, Gifu Prefecture
- 1.EPC for the new plant's production facilities
- Chilled plant production facilities (natto production)
- Dry plant production facilities (manufacturing of pouch container products, bulk products for commercial use, etc.)
- Utility facilities (water treatment, wastewater treatment, boiler)
- 2.Relocation of production facilities from other plants
- Disassembling work, overhaul, reassembling work
TS Tech Co., Ltd.
Project name: New Car Seat Factory / PCC Warehouse Construction
- Completed in 2012
- Kounosu City, Saitama Prefecture
- 1.Construction of a car seat manufacturing plant (total floor area 9,986 m2) and auxiliary facilities
- 2.Construction of PCC warehouse (Parts Control Center, total floor area 2,741 m2)
Kiraku Kougyou Co., Ltd. Kita Kyushu Works
Project name: Waste Oil Incineration Plant Facilities Construction
- Completed in 2014
- Kitakyushu City, Fukuoka Prefecture
- 1.Construction of an incinerator and auxiliary equipment
- 2.Design through to construction of electric power distribution, instrumentation control and electrical control systems
- 3.Installation of a steam turbine power generation system using exhaust heat from the incinerator
Myodo Metal Co., Ltd. Re-Rolling Factory
Project name: Stainless-steel Sheet Continuous Annealing Line Electrical Equipment Renewal
- Completed in 2016
- Tsubame City, Niigata Prefecture
- 1.Installation of AC motor & inverter drive system (replacement of DC motor drive system)
- 2. Installation of PLC & HMI control system (replacement of analog control system)
VAM®BRN SDN BHD
Project name: Seamless OCTG Pipe Threading Line EPC
- Completed in 2016
- Negara Brunei Darussalam
- 1.Machine installation work
- Customer-supplied equipment: conveyance facilities, production facility (total weight approx. 410 t)
- TPSC-procured equipment: boiler, compressor, jib crane, band saw, lathe, drill press, milling machine, pipe rack, workbench (total weight approx. 130 t, gross piping length 7,000 m)
- 2.Electrical construction work
- TPSC-procured equipment: 41 electricity distribution panels (total cabling length approx. 24,000 m)
TS Tech (Thailand) Co., Ltd.
Project name: Car Seat Manufacturing Plant EPC
- Completed in 2013
- Hemaraj Chonburi Industrial Estate, Thailand
- 1.Factory building work (total floor area 33,760 m2)
- 2.Construction of electrical, air-conditioning, and plumbing equipment
Kansai Resin (Thailand) Co., Ltd.
Project name: Paint Facility Enlargement for Resin Production EPC
- Completed in 2016
- Eastern Seaboard Industrial Estate (Rayong), Thailand
- 1.Installation of tank, heat exchanger, pump, compressor, cooling tower
- 2.Piping and cabling work
PT Kansai Paint Indonesia
Project name: Paint Facility Enlargement for Resin Production EPC
- Completed in 2013
- Mm 2100 Industrial Town, Indonesia
- 1.Tank, condenser, pump, heat exchanger, boiler, cooling tower, chiller
- 2.20 kV transformer (800 KVA), high platen, low platen, operation panel, control panel
- 3.Instrumentation equipment
- 4.Installation work, plumbing work, cabling work, and commissioning work
Daikure (Thailand) Co., Ltd.
Project name: Grating Manufacturing Facility Relocation EPC
- Completed in 2011
- Hi-Tech Industrial Estate, Thailand
- 1.Production facilities disassembling work in Japan and exporting to Thailand
- 2.Production facilities reassembling work in Thailand
Tigerpoly (Thailand) Ltd.
Project name: Car Parts Manufacturing Plant EPC
- Completed in 2016
- Rojana #1 Industrial Estate (Ayutthaya), Thailand
- 1.Factory ridge building work (including electric power distribution, air conditioning and plumbing equipment)
- 2.Canteen, locker room, and scrap area building work
Toshiba Carrier (Thailand) Co., Ltd.
Project name: Home & Business-use Air-conditioner Factory EPC
- Completed in 2013
- Bangadi Industrial Estate (Pathum Thani), Thailand
- 1.Factory building work (including electric power distribution and air-conditioning and plumbing equipment)
- 2.Canteen & multistory parking space building work (futsal court of the FIFA official size on the canteen roof)
Toshiba Information Equipment (Philippines), Inc.
Project name: Electric Facilities for Plant & Private Power Generation Facilities EPC
- Since 1996
- Laguna Technopark, Philippines
- 1.Power receiving and transforming facilities, power distribution facilities, private power generation facilities, exhaust heat recovery-type absorption refrigerator, air conditioning, lighting, etc.
- 2.Maintenance work for the plant area (total floor area 150,000 m2)