List of Orders
Konan Utility Co., Ltd.
Project name: Construction of biomass power generation facilities
- Completed in 2019
- Kobe City, Hyogo Prefecture
- Scope of order
-
-
EPC project for woody biomass power generation facilities
- Woody biomass power generation facilities
@Boiler and ancillary equipment
@Steam turbine generator facilities
@Electrical facilities (e.g., power and control cabinets)
@Monitoring & control facilities (DCS) - Civil engineering and machine foundation work for woody biomass power generation facilities and construction of the facility building
- Rehabilitation of existing electrical facilities and installation of new cabinets
- Rehabilitation of existing DCS facilities
- Woody biomass power generation facilities
Tokuyama Corporation
Project name: By-product Hydrogen Plumbing Line
- Completed in 2016
- Shunan City, Yamaguchi Prefecture
- Scope of order
-
- 1.Hydrogen energy local production & consumption model project
High-purity hydrogen is a by-product of caustic soda production at Tokuyama Factory of Tokuyama Corporation.
The by-product hydrogen is transported to a neighboring swimming pool via a pipeline and used for fuel-cell electricity generation (100 kW). The exhaust heat of the fuel cells is used to heat the water for the swimming pool. - 2.In this project, TPSC laid hydrogen pipes (approx. 1.2 km) from the factory to the fuel cell facility and erected three buffer drums (20 m in height, 100 m2).
- 1.Hydrogen energy local production & consumption model project
Tsuruoka Biomass Power Plant
Project name: Woody Biomass Power Plant
- Completed in 2015
- Tsuruoka City, Yamagata Prefecture
Scope of order: Woody biomass power plant (1.99 MW)
- Engineering work for the entire system and EPC for a high-voltage substation
Hokkaido Power Engineering Co., Inc.
Project name: Gas Engine Cogeneration System for Toyota Motor Hokkaido
- Completed in 2013
- Tomakomai City, Hokkaido
Scope of order: Natural-gas gas engine cogeneration facilities EPC (7,800 kW)
- Factory building work
- Gas engine generator and peripheral equipment installation work
- Exhaust heat emitted by the gas engine is collected from all the systems for steam, coolant, and lubricating oil, and is used for additional power generation.