Our EPCC business has facilitated the expansion of power generation systems both in Japan and abroad, ranging from industrial thermal power plant systems that are the main energy source for industrial plants and those for power companies, independent power producers (IPP), and power producers and suppliers (PPS). We offer solutions tailored to our clients' diverse needs by leveraging our world-leading engineering prowess, the combined capability of the Toshiba Group for global procurement, and the expertise cultivated through various construction projects.

Overseas Thermal Power Plant Systems

Through close coordination with our overseas local subsidiaries, we have expanded our EPCC business for small- to mid-size combined-cycle and coal-fired thermal power plants in Southeast Asia, India, Africa, and elsewhere. Our excellent track record for highest-quality construction has been highly acclaimed by our clients.

Domestic Thermal Power Plant Systems

We are engaged in EPCC business for commercial power plants for domestic steel manufacturers, paper manufacturers, chemical plants, and IPP and PPS thermal power plants. We also provide installation, construction, commissioning, calibration, and maintenance services for power equipment as a member of the Toshiba Group.

Key Points

  • We make the best use of TIET (TPSC Integrated Engineering Tools), an integrated engineering tool for EPCC projects developed in-house. We also use a common server for concurrent engineering* to connect our headquarters, overseas offices, and construction sites around the world.
  • TIET was awarded the PACE ZENITH AWARD 2015 in the Power and Energy Management category in June 2015.
  • By using our unique T-PRIDE (TPSC Project Integrated Drive Engine) project management system, we organically compare plans and results in terms of costs, schedules, and resources, and appropriately control estimated completion dates in order to satisfy the client requirements for the quality of costs and delivery times.
  • Concurrent engineering: Parallelization of engineering tasks at, and synchronization and sharing of data across, multiple overseas offices to improve engineering quality and reduce lead time.

More on "TIET" , "T-PRIDE"

List of Orders

PT CIREBON ENERGI PRASARANA

Project name: Cirebon2 coal-fired power plant Project

Completed in 2023 Java, Indonesia

Scope of order: Installation of coal-fired power plant facilities (1x1,000MW)

  • Prime project contractor: Toshiba Energy Systems & Solutions Corporation

B.Grimm Power (Laem Chabang) 1 Limited

Project name: BPLC1R Combined Cycle Cogeneration Plant (BPLC1R CCCP)

Completed in 2022
Laem Chabang, Thailand

Scope of order: Combined cycle thermal power plant facilities EPC (140MW)

Amata B.Grimm Power 1 Limited

Project name: ABP1R Combined Cycle Cogeneration Plant (ABP1R CCCP)

Completed in 2022
Chonburi District, Thailand

Scope of order: Combined cycle thermal power plant facilities EPC (140MW)

Amata B.Grimm Power 2 Limited

Project name: ABP2R Combined Cycle Cogeneration Plant (ABP2R CCCP)

Completed in 2022
Chonburi District, Thailand

Scope of order: Combined cycle thermal power plant facilities EPC (140MW)

B.Grimm Power (AIE-MTP) Limited (BPAMR)

Project name: BPAMR Combined Cycle Cogeneration Plant (BPAMR CCCP)

Completed in 2023
Map Ta Phut, Thailand

Scope of order: Combined cycle thermal power plant facilities EPC (2x140MW)

B.Grimm Power (Angthong) 2 Limited (BPAT2)

Project name: BPAT2 Combined Cycle Cogeneration Plant (BPAT2 CCCP)

Under construction (as of April 2023)
Angtong, Thailand

Scope of order: Combined cycle thermal power plant facilities EPC (140MW)

B.Grimm Power (Angthong) 3 Limited (BPAT3)

Project name: BPAT3 Combined Cycle Cogeneration Plant (BPAT3 CCCP)

Under construction (as of April 2023)
Angtong, Thailand

Scope of order: Combined cycle thermal power plant facilities EPC (140MW)

CHIMEI Corporation

Project name: CHIMEI Cogeneration Plant 2 x 30MW

Completion in Feb 2023
Tainan, Taiwan

Scope of order: Gas turbine cogeneration facilities EPC

Sumitomo Corporation

Project name: Tanjung Jati B coal-fired power plant Unit 5 & 6 Expansion Project

Completed in 2022
Java, Indonesia

Scope of order: Installation of coal-fired power plant facilities (2x1,000MW)

  • Prime project contractor: Toshiba Energy Systems & Solutions Corporation

NTPC Limited

Project name: Darlipali Super Thermal Power Station

Completed in 2021
Orissa state, India

Scope of order: Installation of coal-fired power plant facilities (2x800MW)

  • Prime project contractor: IToshiba JSW Power Systems Private Ltd. (Toshiba JSW)

Sumitomo Corporation

Project name: Matarbari ultra-super critical coal-fired thermal power plant

Under construction (as of April 2023)
Matarbari Island , Bangladesh

Scope of order: Supply of BOP facilities and overall installation(2 x 600MW)

Mitsubishi Corporation

Project name: Sulsel Barru 2 Coal fired Steam Power Plant

Under construction (as of April 2023)
South Sulawesi province, Indonesia

Scope of order: Coal-fired power plant facilities EPC (1 x 100MW)

CEL2 (Cambodia Energy Limited)

Project name: CELII - 150MW Coal Power Plant at Stung Hav, Sihanoukville

Completion in 2022
Sihanoukville, Cambodia

Scope of order: Coal-fired power plant facilities EPC (150MW)

Jimah East Power Sdn Bhd

Project name: Jimah East coal-fired power plant

Completed in 2019
Negeri Sembilan, Malaysia

Scope of order: Installation of coal-fired power plant facilities (2 x 1,000MW)

  • Prime project contractor: Toshiba Corporation

Mitsubishi Corporation

Project name: Electricity Generating Public Company Limited
Banpong Utilities Gas Co-generation Facilities EPC

Completed in 2017
Ratchaburi, Thailand

Scope of order: Combined thermal power generation facilities EPC (113MW, 117MW)

Sumitomo Corporation

Project name: Taiwan Power Company Talin Coal-Fired Power Plant

Completed in 2020
Kaohsiung, Taiwan

Scope of order: Installation of steam turbine generator (STG) power plant facilities (2x 800MW), and supply of bulk materials

  • Prime project contractor: Toshiba Corporation

Sumitomo Corporation

Project name: TANESCO (TANZANIA ELECTRIC SUPPLY COMPANY LIMITED) Kinyerezi Combined Cycle Thermal Power Plant

Completed in 2019
Suburbs of Dar es Salaam, Tanzania

Scope of order: Combined thermal power generation facilities EPC (2 x 120MW)

Buayai Bio. Power Co., Ltd.

Project name: Buayai Biomass Thermal Power Plant

Completed in 2019
Nakhon Ratchasima, Thailand

Scope of order: Provision of steam turbine generator (STG) power plant co-generation facilities (STG) (55MW)

Amata B.Grimm Power Limited

Project name: No.5 Gas-Cogeneration Facility EPC for Amata City Industrial Estate

Completed in 2018
Chonburi, Thailand

Scope of order: Combined cycle thermal power plant facilities EPC (120MW)

No.5 Gas-Cogeneration Facility EPC for Amata City Industrial Estate

Amata B.Grimm Power Limited

Project name: No.3 and 4 Gas-Cogeneration Facilities EPC for Amata City Industrial Estate

Completed in 2018
Chonburi, Thailand

Scope of order: Combined cycle thermal power plant facilities EPC (2 x 120MW)

Amata B.Grimm Power Limited

Project name: No.4 and 5 Gas-Cogeneration Facilities EPC for Amata Nakorn Industrial Estate

Completed in 2016
Chonburi, Thailand

Scope of order: Combined cycle thermal power plant facilities EPC (2 x 120MW)

No.4 and 5 Gas-Cogeneration Facilities EPC for Amata City Industrial Estate

Sumitomo Corporation

Project name: Electricity Generating Authority of Thailand North Bangkok Combined Cycle Thermal Power Plant

Completed in 2016
Bangkok, Thailand

Scope of order: Supply of BOP facilities and overall installation (2 x 440MW)

North Bangkok Combined Thermal Power Plant

Bowin Clean Energy Limited

Project name: Bowin Clean Energy Combined Cycle Thermal Power Plant

Completed in 2016
Chonburi, Thailand

Scope of order: Combined cycle thermal power plant facilities EPC (130MW)

TATA Power

Project name: Mundra Coal-Fired Power Plant Units No.1 to 5

Completed in 2014
Gujarat, India

Scope of order: Installation of steam turbine generator (STG) (5 x 800MW)

Mundra Coal-Fired Power Plant Units No.1 to 5

Marubeni Corporation

Project name: PT Pertamina (Persero) Kramasan Combined Cycle Thermal Power Plant

Completed in 2014
South Sumatra, Indonesia

Scope of order: Civil engineering, installation and trial operations of combined cycle thermal power plant facilities (2 x 40MW)

Amata B.Grimm Power Limited

Project name: No.3 Gas-Cogeneration Facilities EPC for Amata City Industrial Estate

Completed in 2013
Chonburi, Thailand

Scope of order: Combined cycle thermal power plant facilities EPC (2 x 120MW)

No.3 Gas-Cogeneration Facilities EPC for Amata City Industrial Estate

Amata B.Grimm Power Limited

Project name: No.1 and 2 Gas-Cogeneration Facilities EPC for Amata City Industrial Estate

Completed in 2013
Chonburi, Thailand

Scope of order: Combined cycle thermal power plant facilities EPC (2 x 120MW)

No.1 and 2 Gas-Cogeneration Facilities EPC for Amata City Industrial Estate

Marubeni Corporation

Project name: VIETNAM ELECTRICITY Nghi Son Coal-Fired Power Plant Facilities

Completed in 2013
Nghi Son, Vietnam

Scope of order: Coal-fired power plant BOP facilities EPC (2 x 300MW)

Sumitomo Corporation

Project name: PT Pertamina (Persero) Tanjung Jati B Extension Coal-Fired Power Plant

Completed in 2012
Java, Indonesia

Scope of order: Installation of coal-fired power plant facilities (2 x 660MW)

  • Prime project contractor: Toshiba Corporation
Tanjung Jati B Extension Coal-Fired Power Plant

Toyota Tsusho Corporation

Project name: West Delta Electricity Production Company Sidi Kerir Combined Cycle Thermal Power Plant

Completed in 2010
Alexandria, Egypt

Scope of order: Combined thermal power plant BOP facilities EPC (750MW)

Toyota Tsusho Corporation

Project name: Middle Delta Electricity Production Company El-Atf Combined Cycle Thermal Power Plant

Completed in 2010
Mahmoudia, Egypt

Scope of order: Combined thermal power plant BOP facilities EPC (750MW)

Sumitomo Corporation

Project name: TENAGA NASIONAL BERHAD Port Dickson 2 Combined Cycle Thermal Power Plant

Completed in 2009
Negeri Sembilan, Malaysia

Scope of order: Installation of combined cycle thermal power plant facilities (750MW)

  • Prime project contractor: Toshiba Corporation

Sumitomo Corporation

Project name: TENAGA NASIONAL BERHAD Jimah Coal-Fired Power Plant Units 1 and 2

Completed in 2009
Negeri Sembilan, Malaysia

Scope of order: Installation of coal-fired power plant facilities (2 x 700MW)

  • Prime project contractor: Toshiba Corporation

Marubeni Corporation

Project name: Brunei Darussalam Department of Electrical Services, Ministry of Energy and Industry Tutong Combined Cycle Thermal Power Plant

Completed in 2007
Tutong, Brunei

Scope of order: BOP facilities, including a heat recovery steam generator (HRSG)

Sumitomo Corporation

Project name: TENAGA NASIONAL BERHAD Tanjung Bin Coal-Fired Thermal Power Plant Units 1 to 3

Completed in 2006
Johol, Malaysia

Scope of order: Installation of steam turbine generator (STG) (3 x 700MW)

  • Prime project contractor: Toshiba Corporation

Tosoh Corporation

Project name: Nanyo Complex Turbine Power Plant Construction Unit 7

Under construction (as of April 2023)
Shunan City, Yamaguchi Prefecture

Scope of order: Turbine Island EPC (74MW)

Nakao Geothermal Power Corporation

Project name: Okuhida Onsen Village Nakao Geothermal Power Plant

Completed in 2022
Okuhida Onsengo Nakao, Takayama City,
Gifu Prefecture

Scope of order: Turbine Island EPC (2MW)

Okuhida Onsen Village Nakao Geothermal Power Plant

IHI Corporation, IHI Plant Co., Ltd.

Project name: Yatsushiro biomass power plant construction work

Under construction (as of April 2023)
Yatsushiro City, Kumamoto Prefecture

Scope of order: Turbine Island EPC (75MW)

Goi United Generation LLC.

Project name: Goi Thermal Power Station Replacement Work

Under construction (as of April 2023)
Ichihara City, Chiba

Scope of order: Installation of combined cycle thermal power plant facilities (2,340MW)

  • Joint Venture with Toshiba Energy Systems & Solutions Corporation

Electric Power Development Co.,Ltd.

Project name: Takehara Thermal Power Plant

Completed in 2020
Takehara City, Hiroshima

Scope of order: Installation of coal-fired power plant facilities (600MW)

  • Prime project contractor: Toshiba Energy Systems & Solutions Corporation

Kashima Power Co.,Ltd.

Project name: Kashima Thermal Power Plant

Completed in 2020
Kashima City, Ibaragi

Scope of order: Installation of coal-fired power plant facilities (645MW)

  • Prime project contractor: Toshiba Energy Systems & Solutions Corporation

Tohoku Electric Power Co.,Inc.

Project name: Noshiro Thermal Power Plant

Completed in 2020
Noshiro City, Akita

Scope of order: Installation of coal-fired power plant facilities (600MW)

  • Prime project contractor: Toshiba Energy Systems & Solutions Corporation

Kyushu Electric Power Co.,Inc.

Project name: Matsuura Thermal Power Plant

Completed in 2019
Matsuura City, Nagasaki

Scope of order: Installation of coal-fired power plant facilities (1,000MW)

  • Prime project contractor: Toshiba Energy Systems & Solutions Corporation

JFE Engineering Corporation

Project name: Kushiro Coal-Fired Power Plant

Completed in 2020
Kushiro City, Hokkaido Prefecture

Scope of order: Turbine island EPC (112MW)

JFE Engineering Corporation

Project name: Ofunato Power Plant

Completed in 2020
Ofunato City, Iwate Prefecture

Scope of order: Turbine island EPC (75MW)

Hokkaido Electric Power Co.,Inc.

Project name: Ishikariwan Shinko Thermal Power Plant

Completed in 2019
Otaru City, Hokkaido Prefecture

Scope of order: Installation of combined cycle thermal power plant facilities (569.4MW)

  • Prime project contractor: Toshiba Corporation

JFE Engineering Corporation

Project name: EREX New Energy Saiki Power Plant

Completed in 2016
Saiki City, Oita Prefecture

Scope of order: Provision of steam turbine generator power plant facilities, guiding installation, commissioning (50MW)

JFE Steel Corporation

Project name: JFE Steel Corporation Chiba Region Western Power Plant Low BTU Gas Firing Combined Cycle Thermal Power Plant Facilities

Completed in 2015
Chiba City, Chiba Prefecture

Scope of order: Combined cycle thermal power plant facilities EPC (166MW)

Tokai Kyodo Hatsuden K.K.

Project name: Nagoya Power Plant

Completed in 2012
Tokai City, Aichi Prefecture

Scope of order: Upgrade of high-pressure casing for steam turbine (149MW)

Tokyo Electric Power Company Holdings, Inc.

Project name: Futtsu Thermal Power Plant Unit 4-1, Unit 4-2

Completed in 2010
Futtsu City, Chiba Prefecture

Scope of order: Installation of combined cycle thermal power plant facilities (2 x 507MW)

  • Prime project contractor: Toshiba Corporation

Osaka Gas Co. Ltd.

Project name: Senboku Natural Gas Power Plant Unit 3, Unit 4

Completed in 2009
Sakai City, Osaka Prefecture

Scope of order: Installation of combined cycle thermal power plant facilities (2 x 277.5MW)

  • Prime project contractor: Toshiba Corporation

Kansai Electric Power Co. Ltd.

Project name: Maizuru Power Plant Unit 2

Completed in 2009
Maizuru City, Kyoto Prefecture

Scope of order: Installation of coal-fired power plant facilities (900MW)

  • Prime project contractor: Toshiba Corporation

Tohoku Electric Power Co. Inc.

Project name: Haramachi Thermal Power Plant Unit 1

Completed in 2009
Minamisoma City, Fukushima Prefecture

Scope of order: Post-earthquake recovery work for coal-fired power plant facilities (1,000MW)

  • Prime project contractor:Toshiba Corporation

Sumitomo Joint Electric Power Co., Ltd.

Project name: Niihama Thermal Power Plant

Completed in 2008
Niihama City, Ehime Prefecture

Scope of order: Engineering work and installation of steam turbine generator (STG) power plant facilities (150MW)

Sigma Power Ariake Co., Ltd.

Project name: Miike Power Plant Unit 2

Completed in 2008
Omuta City, Fukuoka Prefecture

Scope of order: Upgrade of high-pressure casing for steam turbine (175MW)

Tosoh Corporation

Project name: Nanyo Complex No.2 Power Plant Unit 6

Completed in 2008
Shunan City, Yamaguchi Prefecture

Scope of order: Engineering work and installation of steam turbine generator (STG) power plant facilities (220MW)

Toray Industries, Inc.

Project name: Tokai Plant Power Plant Facilities

Completed in 2007
Tokai City, Aichi Prefecture

Scope of order: Engineering work and installation of steam turbine generator (STG) power plant facilities (52MW)